Railways.

Railway Electrification.

Navigating through this website is easier with the navigator frame which should be to the left of this window. If it is not there then click here to turn it on! Alternatively there is a system map at the foot of this page.

More information about this website & why it was created can be found by visiting this website's 'front' pages (link opens in a new window).

Many images are "clickable" - run the mouse over them and if a "hand" appears then click & a larger version will open in a new window!

This page primarily focuses on types of railway electrification, the benefits of electrification within the context of the railway sphere of operations and the present-day scene here in Britain.

Whilst many of the comments on this page will also apply to all the different types of transport looked at on this website to avoid too much duplication this page does not cover the environmental etc., benefits of electric traction per se as those issues are fully explored on the Electric Buses page (link here).

The case for more railway electrification is as relevant today as when steam locomotives were the main form of motive power.

Plumes of black smoke from a steam engines as it passes through Wembley Park Station in north London. See caption for picture information.
Just in case anyone needs reminding - steam engines may be glamorous, but look at that black smoke - an environmental disaster on wheels! In country areas burning embers from coal fuelled steam engines often cause lineside fires.

click me for videoThe above image is a video-still - click the image or the projector icon to watch a short film on 'youtube' showing the train as it passes through the station.
Diesel trains are less dirty than steam trains but they too face environmental challenges which at this almost fully enclosed station (London Waterloo) resulted in the installation of a waste air extraction system so that the passengers and station staff do not have to breathe the (allegedly) carcinogenic diesel engine exhaust fumes.

Electric railways have the potential to be the least environmentally damaging form of traction. Although this depends on how the power is sourced, even the dirtiest emissions are easier to reduce at a few power stations compared to many hundreds of moving trains.

Electrification is also a more efficient way of transmitting power, especially on the busiest and most heavily trafficked routes where any additional capacity (either through longer trains or more frequent services) will require proportionally less additional energy when it comes from a common source rather than on each train. Electric locomotives can deliver as much as 2½ times the tractive power output of an equivalent diesel.

With electric traction it is also possible to further increase efficiency through regenerative braking, which means that a slowing-down train can use its electric motors as generators and recycle energy back into the system for other electric trains to use. Electric traction offers significantly improved performance when ascending gradients, plus the possibility of using regenerative braking to cost efficiently maintain safety whilst descending..

For passengers the advantages of electric traction includes improved overall performance and less vibration which results in faster, more comfortable, smoother and quieter journeys. The improved acceleration also means that extra stations can be served with less time penalty - this is especially beneficial to users of minor stations which might otherwise have a less frequent service. Experience has shown that the very act of investing in railway electrification also gives passengers greater confidence that the line is 'valued' by the railway operators and therefore has a secure future. The sparks effect is a well proven phenomena whereby passenger numbers significantly increases when a line is electrified.

Transport operators usually find that thanks to the fewer moving parts and the 'slide out / slot in' modularity of the traction packages electric trains are simpler and cheaper to maintain. As with trolleybuses the reduced vibration and sheer ruggedness of the electric traction system means that although they are more expensive to initially purchase their operational lives will be far longer than their fossil fuel counterparts, so in the longer term they will be more cost efficient.

Critics of electric traction often allege that when the necessary electricity is sourced from fossil fuels all that is really happening is that the pollution is being shifted up the energy chain to the power station. However, following extensive research in the University of California it has been found that even with low grade coal that produces a lot of carbon dioxide (as is used in Germany) electric traction offers an almost complete elimination of carbon monoxide and hydrocarbons, resulting in a significant global air quality benefit. Of course if the fuel used is high grade coal or natural gas (or another so called 'cleaner' fossil fuel) the benefits are even admirable. Experience in Sweden has shown that when a type of coal-burning power station known as 'pressurised fluidised-bed' is used then the emission of sulphur oxides and nitrogen oxides are also considerably reduced; furthermore, when these facilities are linked in with combined heat and power facilities (ie: provides both electricity and hot water which can be made available to industrial and domestic consumers alike) then they are about 40% more efficient than their traditional large coal burning equivalents, (75% efficient opposed to 35% efficient) and are so clean that they can even be located within cities.

Of course where the electricity is sourced from renewable sources (eg: hydro, wind, waves, solar, geothermal and tides) it will be 100% non-polluting, it is to be very much regretted that despite the potential benefits (and the globally recognised need for humankind to adopt more environmentally sound policies - anyone remember Rio 1992??) only the first two of these are used to any extent.

People who live near rail lines have found that electric trains are also quieter than diesel trains (both locomotives and multiple-unit passenger carriages) and therefore are better neighbours.

See caption for picture information. See caption for picture information.
Britain's first electric railway was the Volk's Electric Railway which opened on 3rd August 1883. It runs along the sea front at the fashionable south coast seaside resort of Brighton and was named after Magnus Volk who was an Electrical Engineer to Brighton Corporation. As this picture suggests, the line is still open. Originally it was electrified at 50v dc but in 1884 this was increased to 160v dc with one of the running rails also acting as the live and the other as the return. However after severe problems with electricity leakage an insulated 3rd rail located offset between the running rails was installed for the live, with return now being via both running rails.
This view was taken at Black Rock station, which is the eastern terminus.
The first overhead wire powered electric railway 'anywhere' globally opened in 1893 on the Isle of Man.

Featuring tramway-style red painted trolley poles collecting 500v dc from the overhead wire the Manx Electric Railway still uses its orginal trains.

Also on the Isle of Man but not shown on this page is the Snaefell Mountain Railway which uses a slightly higher voltage of 550v dc.

Railway Electrification Types.

Railway electrification will usually take one of two forms - via wires suspended over the tracks or by way of one (or two) extra 'electrified' rail(s) located alongside the tracks. The overhead wire system is more usual for long distance lines whilst the electric rail(s) system (which is usually referred to as 3rd [or 4th] rail) is more often used on city-specific urban rail systems (sometimes called metro / subway / rapid transit). But, as ever, there are exceptions.

Because of the physical presence of the overhead wires the overhead wire system is sometimes thought to be somewhat unsightly - although modern installations can be less visually intrusive than older systems - but by keeping the high voltage well away from track level this system is considerably safer in areas where people might have access to the tracks. Typical voltages used nowadays include 750v dc (primarily on light rail systems) 1500v dc, 3000v dc, 15,000v ac 16 2/3Hz and 25,000v ac (50Hz or 60Hz depending on the frequency of the local mains electricity system).

See caption for picture information.
Croydon trams at the 3 track tram station right outside the main (East) Croydon mainline railway station.

The opening of the Croydon Tramlink system was slightly delayed because of a return current leakage to earth near to the tramstop which serves the mainline railways' East Croydon station. Being a new system this had to be rectified before opening as otherwise if electrolysis had resulted in damage to underground utilities the various utility companies would have been seeking (possibly very expensive) redress from the tramway operators.

The fact that the 3rd rail electric mainline railway might also be leaking current is a different issue - as it was here long before most of the utilities it has what are known as 'grandfather rights'.

The electric rail(s) system is cheaper and easier to install but can pose a safety hazard to people who trespass over the railway as well as track maintenance workers and sometimes animals too (especially small mammals). The 3rd rail variant features one extra rail (for the 'live' current) with the electrical return being via the running rails (the rails the trains' wheels 'run' on / use). The 4th rail system uses two extra rails with there being one each for the live and return. In this way there is a 'closed' circuit from where the electricity is less likely to 'leak' into the surrounding ground - a process which can cause electrolysis, corroding metal structures - such as water pipes, sewers, and whatever else is in the ground - to such an extent that they need (possibly expensive) replacement.

Typically the electric rail systems will use voltages between 600v dc, and 1,200v dc - higher voltages can become impractical because the electricity would arc from the rail - literally jumping or short circuiting to the ground - and completing the circuit back to the power station without providing any useful benefit. Lower voltages require the electrical feeder or sub-stations to be installed at more frequent intervals along the line in order to feed electricity into the system, increasing the cost of operating the railway.

There are several variants to 3rd rail power systems with power being collected from the 'top', 'side' or 'underside' of the rail. The latter two are safer as it is easier to protect against a person accidentally stepping onto the rail. They are also more beneficial in winter when snow and ice can encrust the rails - with the 'top' system it is too easy for the surface to become so covered that it compromises the ability of train to collect electrical power. Occasionally this can cause trains to become stranded, more often however there is just a lot of noise and spectacular sparking as the high currents 'burn' through the moisture. If this sparking happens whilst a train is stationary (ie: stopped at a red signal or calling at a station) it can result in the 'shoe' that collects the power from the electric rail welding itself to the electric rail!! (This has happened on open-air sections of London's Underground - causing delays whilst a welder is summoned to 'free' the train).

See caption for picture information. See caption for picture information.
Virtually the entire Swiss railway system is now electrified, mostly at 15,000v ac using overhead wires although a few routes use lower voltages and a handful still feature a three-phase ac system which requires the trains to collect power from twin overhead wires. At one time many mainline railway routes were equipped for this system, especially in Italy, nowadays only a handful of routes are left - including the Jungfraubahn, as seen here. This 9km line opened in 1912 and is electrified at 1125v.
See caption for picture information. See caption for picture information.
Some urban transport systems use a fixed rail as an alternative to overhead wires. This is especially advantageous in tunneled systems where space above the train is very limited, and the upward 'movement' associated with traditional flexible overhead wire systems (when the pantograph, which by its very nature must exert an upward pressure, passes underneath) could make overhead electrification impracticable.

This example comes from the Barcelona, Spain, Metro, which converted from third rail to overhead power supply for reasons of safety and economy (cheaper track maintenance).

Image courtesy of the Association for the Promotion of Public Transport http://www.laptp.org/ - link to an external site which opens in a new window. Click image to see a larger version in a new window.
Third rail electric railway at Chamonix, France.

In common with many overseas railways this line is partially unfenced - something which, on this visit in 1980, nearly cost me my life when I explored a siding that had rusty looking rails and believing it to be part of a closed railway nearly stepped onto the rails as I crossed the tracks.

Only later (when I saw trains in motion) did I discover that the line was still open and the electric rail 'live'.

Different sources suggest it is electrified at either 750v dc or 850v dc.

Combination Systems.

Some systems use third rail for part of the route, and overhead lines for the remainder. These exist sometimes because of the connection of separately-owned railways using the different systems, or because of local regulations.

In New York City, electric trains that must use third rail leaving Grand Central Terminal on the former New York Central Railroad (now Metro-North Railroad) switch to or from overhead lines when they need to operate out onto the former New York, New Haven and Hartford Railroad (now Amtrak) line to Connecticut. The switch is made 'on the fly' controlled from the engineer's position.

The Blue Line of Boston's MBTA uses third rail electrification on the city centre subterranean part of the line, and overhead catenary whilst above ground.

The older lines in the west of the Oslo T-bane (urban / underground railway) system were built with overhead lines (some since converted to third rail) while the eastern lines were built with third rail. Trains operating on the older lines can operate both with third rail and overhead lines.

More detailed information on railway electrification systems plus a reasonably full list of the different voltages used - and where - can be found on these two pages of the free online 'Wikipedia' encyclopædia. Railway electrification system   List of current systems for electric rail traction (links to an external site which open in new windows).

Electric Trains in the British Isles Today.

Nowadays most mainline overhead electrification in mainland Britain is at 25,000v ac 50 Hz. In the past some routes used other voltages (primarily but not exclusively 1,500v dc and 6,250v ac 25 Hz) but - with one exception - they have either been converted to the standard (for instance: Manchester to Hadfield / Glossop) or the lines closed (for instance: Lancaster to Morecambe / Heysham). Over the course of time some lines have been converted between different voltages several times. Light rail systems tend to use lower voltages (typically 600v on older systems & 750v dc on newer systems) as this is safer where on-street operation is involved. In Britain we also used to have many electrically operated industrial lines (located at places such as at coal mines) but they have now been closed.

The 'Southern' 3rd rail system mostly uses (a nominal) 750v dc, except on lines shared with Eurostar trains where the voltage has been increased to 850v dc. At first the London Brighton and South Coast Railway electrified its suburban services at 6,700v ac 25 Hz using the overhead wire system but after grouping in 1923 the Southern Railway decided to standardise on the London and South Western Railway's (LSWR) (then) 650v dc 3rd rail system which was also in use elsewhere in south London. It is said that this choice was partly influenced by a greater route mileage having already been electrified using the 3rd rail system. For a while some railway depôts in Southern England were electrified at 750v dc via overhead wires instead of 3rd rails as a safety measure for railway staff.

See caption for picture information. See caption for picture information.
Overhead wire power comes via a pantograph which is (usually) located on the train roof. Powerful springs exert an upwards pressure forcing the pantograph up to the wires, which are kept under tension to resist that upwards force. With third (and fourth) rail systems a heavy 'shoe' which is suspended from a wooden beam attached to the bogies (wheel units) collects power by sliding over the top surface of the electric rails.
The trains seen in the two views above are known as Class 313 Electric Multiple Units and can use both 25,000v ac overhead wire and 750v dc 3rd rail systems.

London's Underground uses the '4th rail' system whereby the electrical return uses a dedicated centre rail, and not the running rails. This is supposed to reduce the chance of 'stray' currents damaging tunnel walls, nearby utilities, etc. Although the underground network is nominally electrified at 630v dc the system actually works so that +420v dc is collected from the outer 'positive' (3rd) rail and -210v dc from the centre 'negative' (4th) rail. Where underground trains operate over electrified mainline railway tracks they collect the full line voltage from the 3rd rail and the 4th rail is electrically bonded to the running rails - which also act as return for the mainline trains. At the boundaries where the trains pass between sections of line electrified on the two systems there are gaps in the electrified 3rd and 4th rails which are of sufficient length to ensure that the trains do not (even briefly) electrically connect the systems together.

Because of the high cost of maintenance London Underground has stated a desire to switch to an overhead power supply system and in the late 1990's it was believed that the Victoria Line would be converted first, concurrent with the introduction of a new fleet of trains. However since train operations was privatised this idea seems to have been dropped. The Victoria Line would have been one of the easiest to convert as its trains do not share tracks with any other lines - how they would convert the Piccadilly and Bakerloo lines (smaller profile 'tube' lines which share tracks with full size trains) could be interesting.

Although at one time the different British railway companies located the electrified rails at different distances from the running rails and different heights from the ground a 'standard' has come about (more by default than planning) using the Southern Railway / London Underground system whereby the powered rail is 'outside' of the running rails (can be either side, but not usually both sides at the same location) and offset 3" (8cm) higher plus 16" (41cm) sideways as measured from the inside of the nearest running rail. Where used the 4th rail is located centrally between the running rails and 1½" (4cm) above it (nowadays only tracks served by UndergrounD trains need this extra rail). One of the few surviving exceptions to the standard is on the Central Line which when it first opened in 1900 used a 3rd rail (energised at 550v dc) centrally located between the tracks, and due to a restricted loading gauge when (in 1940) it was converted to standard it was found necessary to locate the outer rail an extra 1½" (4cm) higher than normal. This only applies to the earliest sections of the line, between Liverpool Street and White City, and as a result only trains fitted with 'high lift' shoegear can travel over this route. However as the Central Line is self contained this is not a problem.

For the record the Clapham Common - (King William Street) \ Moorgate - Euston section of what is now known as the Northern Line was originally electrified at 500v dc using an off-centre third rail but concurrent with the 1923-4 closure for widening of the tunnels to make them suitable for standard sized London 'tube' trains the surviving section of line was also converted to standard 4th rail operation. (NB: " means inches; metric conversions are approximate).

This might sound surprising but it can - and sometimes does - happen that a train becomes stalled due to loss of contact with the electrified rail. This mostly happens to single-unit multiple-unit trains and electric locomotives, and would be caused by them travelling slowly over complicated junctions where the gaps in the electrified rails are so long that none of the train's power collection shoes are above (and therefore in contact with) the electrified rails. It is less common when a train / locomotive is travelling at even a modest speed - because usually there will be enough inertia for it to reach the next electrified rail before stalling. It is also less common for this to happen to trains formed of two or more multiple-units - because usually even if one of the units finds itself without power the other unit(s) will still have power and this will be enough to keep the entire train moving.

See caption for picture information. See caption for picture information.
The London Underground uses a 4-rail system where the electrical return is isolated from the the running rails (the rails used by the train's wheels).
Sparks like this are quite normal and occurs when the electric power collection 'shoes' of a train that is motoring (ie: drawing power) reach the end of a section of electric power rail.
The Docklands Light Railway features a modified 3rd rail system where powerful springs force the 'shoe' upwards so that it collects power by sliding along the underside of the electric rail. This train was in a special livery to commemorate the Queen's Golden Jubilee.

Apart from the Southern and Underground networks London also has several other 3rd rail systems:-

i) The London & North Western Railway (LNWR) electrified some suburban services serving northern and western suburbs using a 4th rail system similar to that being used on the Underground (which was useful as on some routes mainline and Underground trains shared / still share the same tracks). In the 1970's the surviving electrified LNWR lines were converted to 3rd rail, although the 4th rail was retained where required by London Underground trains. More recently the part of the network which is now known as the 'North London Line' was partially converted to 25,000v ac overhead wire; whilst the controversial closure of the station which served London's Financial District saw services which had linked the Financial District with North London being completely killed off and trains from West London being diverted into East London over tracks which (eventually) became dual-electrified using both 3rd rail (for passenger trains) and overhead wire systems (for freight trains).

ii) London's automated Docklands Light Railway uses a 3rd rail system where power is collected from the underside of the electric rail. This makes it physically incompatible with the other rail systems, however as the DLR was always meant to be a self-contained system this is not an issue. Trains are electrified at the light rail standard of 750v dc.

iii) Until it was shamefully disinvested in (aka: closed) on 30th May 2003 (after 75 years of operation) the 23 miles (37km) long fully automated 'MailRail' (Post Office Railway) featured narrow gauge (2ft - approx 60cms) trains which collected 440v dc from a rail mounted between the running rails. (In the stations the voltage was reduced to 150v dc). This line was for letters and parcels only - not passengers - and many people are most displeased with its closure because it ran right through the centre of London, serving nine 'mail' stations (major post offices / sorting offices) including two mainline passenger railway stations, and saved many hundreds of road traffic journeys daily (& much air pollution).

See caption for picture information. The Finsbury Park - Highbury & Islington - Moorgate section of London's Underground was a self-contained shuttle which used an incompatible 575v dc 4 rail system where the electric rails were 10" (25cm) outside of the tracks, one each per side. This was changed to standard when tube trains replaced the original trains in the late 1930's.
More recently with its incorporation into the 'Great Northern Electrics' mainline electrification in the 1970's it was converted to 3rd rail only and became part of BR using the Class 313 twin-system trains also seen elsewhere on this page.
Note that this line is no longer shown on the famous London UndergrounD map and that although (once again) evening services have recommenced this line is still closed at the weekends.

Away from London four other cities use / did use electric rail systems; all of these featuring the 'top' contact system as on the 'Southern Electric':-

i)       Glasgow.
Referred to locally as a 'Subway' (and not the more usual British term of 'underground') this system features 4ft (approx. 1.22m) gauge trains which are powered at 600v dc via an outside third rail.

ii)       Liverpool (Merseyside).
At one time the city of Liverpool was served by three independent railway companies which operated electric trains. Although they all used electrified rails (mostly energised at 650v dc) the systems were incompatible because the power rails were in different positions (relative to the running rails) and one company's services (Mersey Railway) even included a combination of both 3rd rail and 4th rail systems. Changeover was effected by guard manually switching the electrical return to suit the section of line about to be served. (ie: via the wheels or via the 4th rail).

In 1955 the 4th rail section of the former Mersey system was converted to 3rd rail only operation whilst in the 1970's the construction of the Loop & Link tunnels under Liverpool city centre which for the first time physically linked the two mainline systems saw the former Lancashire & Yorkshire Railway's (L&Y Rly) 3rd rail being relocated to what has become the 'standard' position for Britain. To facilitate this the trains were fitted with temporary 'two shoe' power collection equipment which facilitated collecting traction current from live rails in both the new and old positions.

Liverpools' former overhead railway also used 3rd rail traction (at 500/525v dc) and hosted Britains' first dual voltage electric trains which operated over two different railway companies' tracks. To achieve this the L&Y Rly built special trains whilst the Liverpool Overhead Railway (LOR) relocated its 3rd rail from between the tracks to match the mainline railway's position outside the tracks. On special occasions services of LOR trains were also extended over the L&Y Rly tracks (eg: to the 'Aintree' horse racing circuit). The LOR was not nationalised in 1948 and its closure in 1956 saw it earning the dubious distinction of being the only urban mass-transit rail line in Europe to have completely ceased operations. (OK so Britain is 'offshore Europe') Closure came primarily because the elevated superstructure (for which the railway had gained the nickname dockers' umbrella) was rusting and the cost of repairs were beyond the railway's reach, and despite much public dismay & appeals for help it proved impossible to find sources of finance which were prepared to make enough of a contribution towards the costs.

iii)      Newcastle-Upon-Tyne.
The Tyneside area used to have an extensive 600v dc 3rd rail system which was operated by one railway company (North Eastern Railway) so it avoided the incompatibilities which beset Liverpool's network. For safety reasons there was also a small amount of overhead wire electrification in a partially pedestrianised docks area where freight trains used paved tracks. Unfortunately in the 1960's changing demographics saw the more lightly used sections of the Tyneside Electrics being closed and the rest of the system de-electrified in favour of diesel trains, with the BR-built trains of 1955 being redeployed in southern England. Since 1981 much of the route has been re-electrified at 1500v dc using overhead wires as the Tyneside Metro. Despite being classified as 'light' rail these metrocars are at the upper end of what constitutes a light rail vehicle. Unlike most trams they were not designed to be 'street compatible', and as with the Docklands Light Railway the type of service they provide is more akin to a 'light metro' than a light railway.

iv)      Manchester.
At first the Holcombe Brook - Bury - Manchester line was (partially) electrified at 3,500v dc using overhead wires but in 1918 this was replaced with the 1200v dc side-contact 3rd rail system. More recently the surviving section of this route has become part of the 750v dc overhead wire Metrolink light rail system.

For reasons of safety it is very unlikely that any new railway electrification schemes here in Britain would be allowed to use the electric rail system - although extensions to the existing systems are allowed. Instead new schemes would be energised via overhead wires.

See caption for picture information. See caption for picture information.
Away from London and Southern England the only other locality in Britain where there is a mainline railway service powered via electric rails is Merseyside (Liverpool).

A southbound Merseyrail train for Hunts Cross leaves Sandhills station.
The Glasgow Subway is a city-specific system operated by a local transport authority - it is not part of the former British Railways. When it opened in 1896 it became the only underground railway system 'anywhere' globally to feature cable haulage. Electrification came in 1935 using an outside third rail energised at 600v dc.
See caption for picture information. See caption for picture information.
Former LNER 'Tyneside Electrics' 3rd rail electric train which dates from 1937 seen at Tynemouth station shortly before the line was de-electrified by BR in 1966. Image courtesy of Dr I Frew.
NB The clickable large image has been sourced from S-VHS-C videotape and is a little fuzzy.
Modern-era 'Tyneside Metro' train calling at the partially refurbished historic ornate Tynemouth station in 2001. Nowadays this is the only British railway system to be powered at 1,500v dc.
See caption for picture information. See caption for picture information.
The Manchester - Bury (- Holcombe Brook) line was initially (partially) electrified at 3,500v dc using overhead wires but in 1918 this was changed to the unique 1200v dc side-contact third rail system. The view on the left was captured just weeks before closure for conversion to the Metrolink light rail system and the preparatory earthworks for its overhead wire supports can be seen on both sides of the tracks. The view on the right shows the same location a few years later, when Metrolink had become well established.

Most comments on this page refer to Great Britain and the Isle of Man. The only other part of 'The British Isles' which has serious full-time electric railway services is the island of Ireland.

Here electric traction is only used the Dublin area, where there are two systems. The Dublin Area Rapid Transit (DART) provides a suburban service linking coastal communities to the north and south of the city via a route which skirts just to the east of the cities' central business district. Opening in 1996 this service is energised at 1,500v dc via overhead wires. The other system opened in 2004 and is the partly completed two route Luas light rail tramway which serves several suburban areas but (so far) only partially penetrates the city centre.

See caption for picture information. See caption for picture information.
A DART train passes under the Lansdowne Road Rugby Football Stadium and over a level crossing as it enters the station of the same name. A tram on the Green Line at the temporary terminus at St Stephen's Green, which is just to the edge of the city centre. Until the system is fully built the nearest tramstop for the Red Line will remain a 15 minute walk away.

Missed Opportunity -- Yet Again!

In 1981 British Rail and the Department of Transport produced a report (Review of Mainline Electrification) which concluded that even on purely commercial grounds not only was 'a substantial programme of railway electrification financially worthwhile' but that the more extensive and faster options would be better propositions than the more modest ones. It also suggested that the most cost effective way to electrify railways would be by a rolling programme whereby a specialised team of experts will electrify a whole series of lines sequentially (ie: when one line is completed they move to the next) as it would optimise resources and expertise, plus give industry the steady long term order book that creates economic stability.

What this report suggested has often been dubbed the network effect - ie: the more lines electrified the more it would be financially advantageous to electrify even more lines! This is because it would enable more trains to run through services without needing a change of motive power en route, and help avoid (as has happened instead - see below) the wasteful situation arising whereby diesel trains travel significant distances over electrified railways because small sections of the journey involves using non-electrified lines.

However despite the manifold potential benefits to British industry and the wider economy the government refused to allow the creation of such a long term investment plan to which it would have to keep, and instead retained what many people see as a myopic policy of judging every line in complete isolation.

See caption for picture information. See caption for picture information.
Diesel trains running 'under the wires' - an issue that affects both passenger and freight services. Both the types of passenger train / freight engine seen here have been introduced since privatisation.

Since Privatisation - Stagnation!

In the mid 1990's the government split the railways up into a myriad of small 'bite sized' chunks which it privatised. The company that now runs the railway infrastructure does not benefit from investing in railway electrification whilst the train operating companies have such short franchises that there is no benefit to them in making this kind of investment as they could spend the money and then loose the franchise - effectively losing the investment they made. In addition, with each TOC more or less solely interested in what is best for it and not the wider railway system / environment etc., so some of them have even been replacing electric trains (both locomotive-hauled and multiple-unit) with diesel multiple-unit trains. There have been several reasons fo this, which include

  • it has then meant that they can introduce new through services beyond the current extent of electric power supply systems.
  • because most of their 'territory' is not wired and it is cheaper (for them) to have one fleet that can 'go anywhere' than two fleets, one of which is restricted in lines it can serve.

As a result more than a dozen years since railway privatisation has passed with there being virtually no railway electrification, except the occasional fill-in scheme to provide diversionary routes for existing electrified lines during upgrading works. The last real electrification scheme which saw diesel trains being replaced by electrics was in Yorkshire and was began by the former British Railways - and even here because of funding problems resulting from railway privatisation it opened with 30 year-old cast-off electric trains from London. Eventually though they were replaced by a fleet of brand new class 333 electric multiple units and since then passenger numbers have been growing at up to 19% per year. Indeed since they began (in 1995) the electric services have been so successful that the trains now carry as much as 75% of some commuter flows (ie: just 25% of passengers from some areas now travel by road) and despite having been lengthened from three to four carriages in length at busy times severe overcrowding can be a problem.

In many ways this passenger growth is typical of what happens with railway electrification - even here in Britain previous railway electrification schemes have proven the sparks effect to be a phenomena which does boost passenger numbers.

The new electric class 333 trains on the West Yorkshire Airdale / Wharfdale lines (Leeds - Bradford Foster Square / Skipton / Ilkley) have been so popular that passenger numbers have been growing by as much as 19% per year, proving that when given an attractive & viable alternative choice to travelling by road people will choose to use it! Seen near to Saltaire station.
See caption for picture information.

Since Privatisation - Possible Retrenchment?

Instead of electrification things here started going in reverse with some so-called 'experts' suggesting that some routes should actually be de-electrified, and although this has not come to pass there have been many instances of new diesel trains replacing electrics, as stated three paragraphs above (click link to go backwards)

Infill electrification or diesel-electric 'twin-system' trains?

There has been much discussion in government and railway industry circles as to whether it is better to 'infill' electrify sections of line between already existing electrified routes so that electric trains can be extended over more routes or to operate 'twin system' trains which can draw power from overhead wires / electrified rails where available and use onboard liquid fuel (usually diesel) generators to power the train's electric drive system when travelling over non-electrified routes. This discussion was at least in part as a result of the Department for transport starting a consultation process to decide the best way forward for the next generation of InterCity trains for Britain's railways, to act as replacements of the diesel High Speed Trains (HST) that date back to the 1970's.

Some trains, such as the HST and the more modern '(Super)Voyager / Meridian / Pioneer'(§) trains already operate on the diesel-electric principle whereby onboard diesel engines power generators that power the train's electric drive system. Many people see it as being both wasteful of precious fossil fuels and unnecessarily polluting when such trains travel over railway routes which have benefitted from the installation of an electric power supply system but instead of taking advantage of this continue to use their diesel engines to power the train. (§)(Super)Voyager / Meridian / Pioneer trains are essentially very similar trains from the same train builder albeit with different brand names and interior furnishings as per the various TOC's which use them.

Infill electrification requires that money be found to invest in physical infrastructure, which the government has not always been keen to do. For the full benefits of the investment to be realised as many as possible of the trains which use the newly electrified sections of track must themselves be switched to electric working, which in addition to (probably) meaning their replacement with brand new trains will be something that may require more electrification of other routes to be fully achieved.

Twin system trains are effectively trains which carry their own power plant and fuel with them but for part of their journey use an external source of energy (ie: overhead wires or electrified rails). The weight of the onboard power equipment can be considerable, reducing overall energy efficiency as well as increasing maintenance costs and 'wear & tear' on the tracks. If these trains also use the high voltage alternating current power supply system then the electric power transformers (which reduce the voltage to a level which the train's control equipment and motors can actually use) also add to the train's overall weight.

Since privatisation passenger trains have usually been funded by the train leasing companies which actually own them and then lease them to the various TOC's. If new trains are required for the electrification so it is possible that additional funding would become available (from Scottish / Welsh devolved or the British national governments) with the TOC's possibly receiving these funds as a contribution towards the inevitably higher leasing costs.

2007 Study

In 2007 a paper named "Study on further electrification of Britain's railway network" which was published by the Rail Safety & Standards Board (RSSB) also included in its remit some investigations as to the benefits or otherwise of twin-system trains compared with infill electrification of the many shorter lines which are used by through trains to serve destinations remote from main lines which have already been electrified. It found that twin-system trains (such as the Department for Transport has been proposing for the next generation of InterCity trains for Britain's railways) would make for a suboptimal choice. This is partly because centrally powered trains (ie: electric trains powered from overhead wires or electric rails) are generally more powerful, which to emulate would require twin-system trains to have very powerful diesel engines, as otherwise the performance in diesel mode (both when accelerating away from [station] stops and with respect to top speeds) would be so sluggish as to negate the overall journey time benefits gained from faster running when in electric mode. As stated further up this page, electric locomotives can deliver as much as 2½ times the tractive power output of an equivalent diesel.

As an aside, in addition to (bus style) hybrid and twin-system trains the Department for Transport was also interested in exploring other emerging technologies, including the use of alternative fuels such as biofuels and hydrogen fuel cells. However the thinking does seem to have been very much in trying to find an alternative to railway electrification, and not a true appraisal of what would be the optimal way forward for the future.

2008 Change of Plan?

In June 2008 the Transport Secretary suggested that the Govt. might be ready to change its policies and agree to a programme of railway electrification. This is understood to be partly because of recent significant increases in the cost of oil, although the stated reasons also looked to environmental and other advantages. However, it might also be significant that with a general election due within a couple of years and the political party in power faring very badly in recent local elections and Parliamentary by-elections (plus the opinion polls) so it is not inconceivable that this is little more than an early manifestation of the now traditional attempt at pre-election bribes (of the voting public) which effectively see major railway improvements / investments only coming when the politicians want the public to see them in a favourable light. Which may be a shocking thing to even consider, but it has happened before!

See caption for picture information. See caption for picture information.
Because of a lack of infill electrification and that the train manufacturers are not building (for the British market) twin system diesel-electric / straight electric trains, the services operated by Hull Trains have to wastefully travel 160 miles on diesel power over the fully electrified route between London and Doncaster - just so that they can then travel the 40 further miles between Hull and Doncaster, which is not electrified.

These Class 222 Meridian trains were introduced in 2005. They actually work on the diesel-electric principle whereby (multiple) onboard diesel engines power an electric drive system. Whilst infill electrification and their operation as 100% electric trains would represent the optimal decision it is still to be regretted that they were not designed to also be capable of taking power from overhead wires (and the electrified third rails) on routes where such exist.

The above images come from Brough left and Doncaster right. Doncaster image sourced from the free online 'Wikipedia' encyclopædia http://commons.wikimedia.org/wiki/Image:222102_at_Doncaster.jpg
(link to an external site which opens in a new window).

Maybe there is a need for an industry leader who can issue 'guidelines' which will 'frown upon' diesel trains running under the wires (or over third rail electrified routes), and encourage / even insist upon both twin-system trains and electrification of lines (trunk and fill-in) to render diesel operation on electrified routes as being totally unneccessary??

See caption for picture information. See caption for picture information.
Known as Class 73 these electric locomotives also feature diesel engine generators which allow them to operate beyond the extent of the 3rd rail electric network, albeit in a much reduced mode as the diesel engine produces less power than is available from the third-rail supply. A similar philosophy with new trains (both locomotives and multiple units) would permit diesel operation to be restricted to non-electrified routes only. Known as the AGC the French railways operate a large fleet of very successful modern trains which come in many power system formats, including some which can work on both diesel power and overhead electric power. This image shows one of the twin-system (1500v dc and 25,000v ac) electric units which is visually similar to the diesel / electric versions. Image sourced from the free online 'Wikipedia' encyclopædia http://commons.wikimedia.org/wiki/Image:ZGC_Franche_Comt%C3%A9.JPG
(link to an external site which opens in a new window).

Direct link to other Railways pages...

Return to Main Railways page.


Easy access for all! About Railways Transport Integration - making it all mesh together as one seamless entity. Its high time we stopped polluting our cities - we have the technology, but not the willpower
The importance of well designed, functional stops and stations.
Site index
A look at bus transport. Roads
Welcome to this site. NB: this link opens in a new window.
Fares and ticketing systems.
Nostalgia, Heritage & Leisure.
What needs doing to entice people out of their cars - and how to fund it!
Road pricing, road-user charging, motorway / expressway tolling, cordon charging and urban 'congestion' charging.
Bus priority systems
Feeders for mainstream transports and specialist transports meeting different needs.
About light rail - modern trams and streetcars.
The importance of freight trains.
Specific examples of how tram stops fit in the street scene and that trams and parked vehicles can coexist!
The bus gets a stylish makeover.
re-load this page. Ideas to make roads safer.
Often overlooked alternative transports
Traffic free pedestrian zones and transit malls.
Does speed kill - or is it only inappropriate speed that kills (too fast / slow)?
Different types of passenger train as defined by the type of service they provide.
Create urban green corridors.
Quiet, clean buses that won't give you lungful of noxious exhaust fumes. Vehicles need to go somewhere at journey's end.
Let traffic congestion make you the unwilling victim of the crime of time theft!